PROJECT OVERVIEW

DNS were contracted to undertake the site clearance to make way for a temporary car park area in the City Link area of Nottingham inner city.

The three week project saw the formation of bunds around the perimeters and the erection of temporary fencing to secure the site.  General debris and hardcode were cleared and used in the bund formations. The surface area was stripped of bushes, shrubs and vegetation in preparation for removal off site.  Topsoil was retained and stockpiled.

5000 tonne of type 1 material was imported on 8 wheel tipper lorries and spread and levelled with a GPS intelligent dozer, concluding with the trimming and rolling of type 1 material for compaction.

AT A GLANCE

Project Type Site Clearance
Client Thomas Bow
Completion Date November 2017
Project Size 20,000m2
Contract Value £25K

SCOPE OF WORK

  • Formation of bunds around perimeter of site
  • Erection of temporary fencing
  • Hard core and debris clearance
  • Vegetation, bush and shrub strip
  • Importation of type 1 material
  • Spread, level and compaction of type 1 material

Strategically based within the heart of the Country, Thomas Bow City Asphalt are experienced Principal Contractors specialising in the delivery of Highways and Infrastructure Projects throughout the UK.

Thomas Bow Ltd provide core civil engineering, surfacing, facilities management and plant hire business.